| Project Summary
| Anticipated annual system yield |
3,000 Ml Increases to 21,000 ML when operated in conjunction with proposed Wyaralong Dam |
| Total capacity |
1,139 Ml |
| Elevation above sea level |
20.5 metres |
| Max. water depth at dam wall |
6.5 metres |
| Average depth (in river channel) |
3.25 metres |
| Dam wall length |
102 metres |
| Volume of concrete |
4400 cubic metres |
| Quantity of sheet pile |
1,330 tonnes |
| Quantity of reinforcement |
400 tonnes |
| Full Supply Area |
47 ha |
| Construction commenced |
June 2007 |
| Structural completion |
Dec 2007 |
| Construction employment |
Up to 50 staff and 53,000 man hours completed |
| Total capital cost |
$18.5M |
| 
|