Project Summary

 

Anticipated annual system yield 3,000 Ml
Increases to 21,000 ML when operated in
conjunction with proposed Wyaralong Dam
Total capacity 1,139 Ml
Elevation above sea level 20.5 metres
Max. water depth at dam wall 6.5 metres
Average depth (in river channel) 3.25 metres
Dam wall length 102 metres
Volume of concrete 4400 cubic metres
Quantity of sheet pile 1,330 tonnes
Quantity of reinforcement 400 tonnes
Full Supply Area 47 ha
Construction commenced

June 2007

Structural completion Dec 2007
Construction employment Up to 50 staff and 53,000 man hours completed
Total capital cost $18.5M

 